ANALISIS PENERAPAN PLANNED MAINTENANCE SYSTEM (PMS) TERHADAP KESIAPAN OPERASIONAL BOWTHRUSTER DI KAPAL FSIV. ALLIANZ JUNO

WAHYU, KURNIAWAN (2025) ANALISIS PENERAPAN PLANNED MAINTENANCE SYSTEM (PMS) TERHADAP KESIAPAN OPERASIONAL BOWTHRUSTER DI KAPAL FSIV. ALLIANZ JUNO. Diploma thesis, Politeknik Ilmu Pelayaran Makassar.

Full text not available from this repository. (Request a copy)
Item Type: Thesis (Diploma)
Subjects: KIT (Karya Ilmiah Terapan) > Ahli Teknika Tingkat 1
KIT (Karya Ilmiah Terapan)
Divisions: Ahli Teknika Tingkat 1
Depositing User: Unnamed user with email perpustakaan@pipmakassar.ac.id
Date Deposited: 07 Apr 2026 02:54
Last Modified: 07 Apr 2026 03:23
URI: http://eprints.pipmakassar.ac.id/id/eprint/1492

Actions (login required)

View Item View Item