PENERAPAN PLANNED MAINTENANCE SYSTEM (PMS) DAN TROUBLE SHOOTING PADA MAIN ENGINE CUMMINS KTA 50

AWALUDDIN, AWALUDDIN (2026) PENERAPAN PLANNED MAINTENANCE SYSTEM (PMS) DAN TROUBLE SHOOTING PADA MAIN ENGINE CUMMINS KTA 50. Diploma thesis, Politeknik Ilmu Pelayaran Makassar.

[img] Text
SAMPUL - BAB II.pdf

Download (677kB)
[img] Text
BAB III - LAMPIRAN.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
Item Type: Thesis (Diploma)
Subjects: KIT (Karya Ilmiah Terapan) > Ahli Teknika Tingkat 1
KIT (Karya Ilmiah Terapan)
Divisions: Ahli Teknika Tingkat 1
Depositing User: Unnamed user with email perpustakaan@pipmakassar.ac.id
Date Deposited: 06 Apr 2026 02:17
Last Modified: 06 Apr 2026 02:17
URI: http://eprints.pipmakassar.ac.id/id/eprint/1466

Actions (login required)

View Item View Item